肉大捧一进一出免费视频,精品无码久久久久久久动漫 ,色婷婷亚洲婷婷七月中文字幕,日韩日韩日韩日韩日韩

從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
服務(wù)電話:0531-83658718
熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
公司動態(tài) 所在位置- 首頁-新聞中心-公司動態(tài)巖棉板施工前后的八方面要點(diǎn)注意

巖棉板施工前后的八方面要點(diǎn)注意

發(fā)布時間:2022-07-30 來源:http://www.95fjrc.com/

http://www.95fjrc.com巖棉板大多用于建筑方面,屬于外墻保溫的一種,很多巖棉板廠家也因此擴(kuò)大了加工車間,同時打價格戰(zhàn),讓巖棉板價格有一定的優(yōu)勢,吸引更多的客戶。那巖棉板施工前后的八方面要點(diǎn)注意具體是什么?
Rock wool board is mostly used in construction, which belongs to a kind of external wall insulation. Therefore, many rock wool board manufacturers have expanded their processing workshops and fought a price war to give rock wool board a certain price advantage and attract more customers. What are the eight key points before and after rock wool board construction?
1.巖棉板外墻外保溫施工期間,基層及施工環(huán)境溫度低于5℃時不得施工。在五級以上大風(fēng)天氣和雨、雪天氣不得施工。施工時及施工后,應(yīng)采取有效措施防止雨水沖刷及烈日暴曬,并應(yīng)及時做保護(hù)層。如施工中突遇降雨,應(yīng)采取措施防止雨水沖刷墻面;冬季施工應(yīng)按照相關(guān)標(biāo)準(zhǔn)采取防凍措施。
1. During the construction of external insulation of rock wool board exterior wall, the construction shall not be carried out when the temperature of base course and construction environment is lower than 5 ℃. Construction shall not be carried out in windy weather above level 5 and rainy and snowy weather. During and after the construction, effective measures shall be taken to prevent rainwater scouring and scorching sun exposure, and a protective layer shall be made in time. In case of sudden rainfall during construction, measures shall be taken to prevent rainwater from scouring the wall; Antifreeze measures shall be taken for winter construction in accordance with relevant standards.
2.大面積施工前,按規(guī)定應(yīng)在現(xiàn)場采用相同材料,構(gòu)造做法和工藝制作樣板墻,并經(jīng)有關(guān)各方確認(rèn)后方可進(jìn)行工程施工。
2. Before large-scale construction, the same materials, construction methods and processes shall be used to make the sample wall on the site according to the regulations, and the project construction can be carried out only after being confirmed by the relevant parties.
3.用巖棉板施工時,操作工人應(yīng)佩戴好勞防用品,做好職業(yè)健康保護(hù),并注重施工安全。
3. When using rock wool board for construction, operators should wear labor protection articles, do a good job in occupational health protection, and pay attention to construction safety.
4.巖棉板外保溫系統(tǒng)有關(guān)必檢的材料應(yīng)送有資質(zhì)的檢測機(jī)構(gòu)進(jìn)行檢測,檢測合格方可使用。
4. Materials related to the external insulation system of rock wool board that must be inspected should be sent to a qualified testing organization for testing, and can be used only after passing the testing.
5.巖棉板的粘貼宜采用條粘法或點(diǎn)粘法,涂膠面積不應(yīng)小于50%。巖棉板抹完膠粘劑后,應(yīng)先將保溫板下端與基層粘貼,巖棉板應(yīng)自下而上沿水平方向橫向鋪設(shè),并應(yīng)采取邊鋪邊錨固,板縫應(yīng)自然靠緊,板間縫隙不得大于2mm,如縫寬2mm時,應(yīng)有保溫材料填充處理,相鄰板面應(yīng)平齊,板間高差不得大于1.5mm。
5. The sticking of rock wool board should adopt strip sticking method or point sticking method, and the gluing area should not be less than 50%. After the adhesive is applied to the rock wool board, the lower end of the thermal insulation board should be pasted with the base course first. The rock wool board should be laid horizontally from bottom to top, and should be anchored while laying. The board joints should be naturally close, and the gap between the boards should not be greater than 2mm. If the joint width is 2mm, there should be thermal insulation material filling treatment, the adjacent board surfaces should be flush, and the height difference between the boards should not be greater than 1.5mm.
濟(jì)南巖棉板
6.所有可達(dá)巖棉板的穿墻管線與構(gòu)件,其出口部位應(yīng)用相同材料填實(shí)后進(jìn)行防水密封處理。
6. The outlet of all through wall pipelines and components that can reach the rock wool board shall be filled with the same material and then treated with waterproof sealing.
7.如在施工過程中發(fā)現(xiàn)貼面層脫落,應(yīng)及時采取粘結(jié)或者用錨固件錨固的方式固定,并及時進(jìn)行外飾面層施工。
7. If the veneer layer is found to fall off during the construction process, it should be fixed in a timely manner by bonding or anchoring with anchors, and the exterior decoration surface layer construction should be carried out in a timely manner.
8.濟(jì)南巖棉板抹面層施工應(yīng)符合以下要求:
8. The construction of Jinan rock wool board plastering layer shall meet the following requirements:
巖棉板粘貼完畢,應(yīng)對板的抹灰面進(jìn)行表面處理,用不銹鋼抹刀對整個表面涂刮抹面膠漿(厚度1~1.5mm),并壓入巖棉板的表層纖維中。抹面膠漿應(yīng)嚴(yán)格按照產(chǎn)品使用說明書進(jìn)行配置,配置好的膠粘劑應(yīng)避免太陽直射,并應(yīng)在2h內(nèi)用完。
After the rock wool board is pasted, the plastered surface of the Board shall be treated, and the whole surface shall be coated with plastering paste (thickness 1 ~ 1.5mm) with a stainless steel spatula, and pressed into the surface fiber of the rock wool board. The plastering glue should be configured in strict accordance with the product instructions. The configured adhesive should avoid direct sunlight and should be used up within 2H.
抹面層分二層進(jìn)行。較好層抹面膠漿厚度2~3mm,應(yīng)先用不銹鋼鋸齒抹刀抹灰,后用大抹刀抹平,并趁濕壓入玻纖網(wǎng)布,待膠漿稍干硬至可觸碰時安裝錨固件,用抹面膠漿封堵錨固件塑料圓盤及其周邊;較好層抹面膠漿稍干可進(jìn)行第二層抹面膠漿施工,厚度2mm左右,抹平并使抹面層厚度達(dá)到設(shè)計要求。
The plastering layer is divided into two layers. The thickness of the better layer of plastering glue is 2 ~ 3mm. It should be plastered with a stainless steel serrated spatula first, then leveled with a large spatula, and pressed into the glass fiber mesh while it is wet. When the glue is slightly dry and hard enough to touch, install the anchor, and block the plastic disc of the anchor and its surrounding with the plastering glue; The better layer of plaster mortar is slightly dry, and the construction of the second layer of plaster mortar can be carried out, with a thickness of about 2mm. Trowel and make the thickness of the plaster layer meet the design requirements.
此外巖棉保溫板施工時需保持表面干燥、無油脂、無銹蝕等條件,為了利于防腐,可采取適當(dāng)涂層,更多相關(guān)信息您可以來我們網(wǎng)站http://www.95fjrc.com看看。
In addition, during the construction of rock wool insulation board, the surface should be kept dry, free of grease, rust and other conditions. In order to facilitate corrosion prevention, appropriate coating can be adopted. For more relevant information, you can come to our website http://www.95fjrc.com have a look.
55夜色66夜色国产精品视频| 人妻三级日本三级日本三级极| 国产精品自产拍高潮在线观看| 无码熟妇人妻av在线影片软件| 老农民里老干棒媳妇回来了吗 | 国产又黄又爽又色又刺激视频| 一夲道无码人妻精品一区二区| 亚洲色熟女图激情另类图区 | 破产姐妹第五季| 女人与公拘交酡ZOZO| 黎明破晓前电视剧全集免费观看| 亚洲AV色香蕉一区二区三区蜜桃 | 狠狠精品干练久久久无码中文字幕| 被老头玩弄邻居人妻中文字幕 | 男男色情gay浴室激情| 偷偷色噜狠狠狠狠的777米奇| 日日摸日日踫夜夜爽无码| 又色又爽又高潮免费视频观看| 娇妻互换享受高潮| 一出一进一爽一粗一大视频| 免费看成人aa片无码视频吃奶| 又色又爽又黄的视频软件app| 从后面挺进岳的玉梅| 麻豆精品久久久久久久99蜜桃| 久久久噜噜噜久久中文字幕色伊伊| 供人泄欲玩弄的妓女h| 邻居少妇太爽了a片在线观看动漫 精品亚洲av成人无码明星换脸 | 久久久久无码精品国产不卡| 男女啪啪做爰高潮全过有多少姿势 | 日日噜狠狠噜天天噜AV| 日本久久高清一区二区三区毛片| 亚洲AV乱码久久精品蜜桃 | 公与媳系列100集| 少妇无码av无码专区线| 国产真实伦熟女实例hd| 女性私密部位粉嫩| 成人午夜剧场| 新版天堂资源在线资源| 扒开双腿抽打花蒂惩罚室| 黄金网站app在线观看| 手机在线看永久AV片免费|