行業(yè)資訊 所在位置- 首頁-新聞中心-行業(yè)資訊鋼筋桁架樓承板安裝使用要注意什么?

鋼筋桁架樓承板安裝使用要注意什么?

發(fā)布時間:2023-05-20 來源:http://www.95fjrc.com/

施工順序
Construction sequence
平面施工順序:每層鋼筋桁架樓承板的鋪設(shè)宜根據(jù)施工圖起始位置向一個方向鋪設(shè),后處理邊角部分。
Plane construction sequence: The laying of each layer of steel truss floor support plate should be carried out in one direction according to the starting position of the construction drawing, and finally, the edges and corners should be treated.
立面施工順序:隨主體結(jié)構(gòu)安裝施工順序鋪設(shè)相應(yīng)各層的鋼筋桁架樓承板。
Facade construction sequence: Lay corresponding steel truss floor support plates for each floor in accordance with the installation and construction sequence of the main structure.
鋼筋桁架樓承板安裝
Installation of steel bar truss floor support plate
適宜在下一節(jié)鋼柱及配套鋼梁安裝完畢后進(jìn)行。
It is suitable to proceed after the installation of the next section of steel columns and supporting steel beams.
樓板鋪設(shè)前
Before laying the floor slab
濟(jì)南樓承板
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時的基準(zhǔn)線。對準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
鋼筋桁架樓承板就位之后
After the steel truss floor support plate is in place
應(yīng)將其端部的豎向鋼筋及底模與鋼梁點焊牢固。沿板寬度方向?qū)⒌啄Ec鋼梁點焊,焊接采用手工電弧焊,間距不大于300mm。
The vertical reinforcement and bottom formwork at its end should be firmly spot welded with the steel beam. Spot weld the bottom formwork with the steel beam along the width direction of the plate. Manual arc welding is adopted for welding, and the spacing is not more than 300mm.
樓板鋪設(shè)前
Before laying the floor slab
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時的基準(zhǔn)線。對準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
本文由濟(jì)南樓承板提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請點擊我們的網(wǎng)站  http://www.95fjrc.com ,我們將會全心全意為您提供滿意的服務(wù)。
This article is supported by Jinan Building Support Board. For more detailed and exciting content, please click on our website http://www.95fjrc.com We will wholeheartedly provide you with satisfactory service.
国产伦理一区二区| 男受被做哭激烈娇喘gv视频| 色综合久久五月色婷婷| 色欲人妻综合AAAAAAAA网| 成人区人妻精品一区二区不卡视频| 蒙古少妇bbb多毛露屁| 校草sao货撅起屁股扒男男| 99久久99久久精品国产片| 日韩在线观看视频| 久久国产精品无码网站| 少妇特黄A一区二区三区| 美国式禁忌2| 久久国产欧美国日产综合抖音| 久久超级碰碰人妻人人妻| 精品人人妻人人澡人人爽牛牛| 日本av在线观看| 行尸走肉第六季在线观看| 久久婷婷五月综合色欧美| 一路向西在线观看完整版| 亚洲色偷偷综合亚洲AVYP| 无码人妻AV免费一区二区三区| 日日狠狠久久偷偷色综合| 新婚美人妻的沉沦| 国产成人精品综合久久久久| 人交CZ00与女性XXX| 97人人添人澡人人爽超碰 | 国产99久久久国产精品~~牛| 怀孕被躁到高潮的孕妇| 亚洲av无码片一区二区三区| 艳鉧动漫1~6无删减版| 国产猛烈高潮尖叫视频免费| 毛耸耸亚洲熟妇性xxxx交潮喷| 新婚美人妻的沉沦| 帅的中国大陆gary1609| 麻豆人妻少妇精品无码区| 亚洲GV白嫩小受在线观看| 老熟女av福利网址导航| 亚洲A∨无码一区二区| 精品亚洲成A人无码成A在线观看| 邪恶工番口番大全邪恶帝| 日本添下边视频全过程|